Overview
Ede’s was appointed to support Pachamama with the relocation of a two-level warehouse from 137 Greenwich High Road, London to Thorp Arch Estate, Wetherby. The project involved the large-scale movement of boxed inventory and racking systems, delivered over a tightly managed multi-day schedule. The key priority was clear: complete the relocation efficiently and on time while ensuring safe handling of all goods and infrastructure.
The Challenge
Delivering a long-distance warehouse relocation within a defined timeframe required careful logistics planning and coordination. Key challenges included:
- Managing the relocation of 2,600 packed boxes and warehouse infrastructure
- Dismantling and transporting nineteen Mecalux racking units
- Coordinating multiple vehicle movements between London and Wetherby
- Ensuring efficient loading and offloading across staggered delivery schedules
- Maintaining programme timelines across a multi-day operation
Our Approach
Ede’s delivered a structured and phased relocation programme, ensuring smooth execution across all stages.
- Initial deployment of an 18-ton vehicle to begin phased relocation
- Use of articulated vehicles to manage high-volume transport efficiently
- Coordinated loading in London with next-day offloading in Wetherby
- Deployment of experienced crew including fitters for racking systems
- Careful handling and transport of boxed goods and specialist equipment
- Continuous coordination to maintain flow across all five days of the project
Health, Safety & Compliance
All works were delivered in line with strict health and safety standards.
- Full Risk Assessment and Method Statements (RAMS) implemented
- Safe dismantling and handling of racking systems
- Appropriate equipment used including pallet trucks and dollies
- Trained personnel deployed across all stages of the move
- Continuous monitoring to ensure safe working practices throughout
The Outcome
The project was successfully delivered on schedule, meeting all operational requirements.
- Relocation of 2,600 boxes and warehouse equipment completed
- Safe dismantling and reinstallation of nineteen Mecalux units
- Efficient coordination of multi-vehicle logistics over five days
- Seamless transition to the new warehouse facility
- Strong delivery performance within the agreed timeframe