North Bridge House school relocation

North Bridge House Schools (Cognita)

November 10, 2026

Ede’s was appointed to support North Bridge House Schools with a coordinated relocation programme across its Pre-Prep at 8 Netherhall Gardens and Nursery School at 33 Fitzjohn’s Avenue. Our role combined internal moves, transfers between the two buildings and deliveries from Ede’s storage facility within a phased schedule.

The brief

The programme required several types of move across a sequence of visits. Packed contents and retained furniture needed to transfer between the schools, while other items required repositioning within each building. Contents already held in storage also needed to be organised for delivery to the correct address.

Preparing for the moves

The initial scope allowed for 220 crates to be delivered to Netherhall Gardens in July, followed by the removal of redundant furniture and support with internal moves. Crate delivery, hire and collection formed part of the wider programme, with empty crate collection scheduled for September.

Transfers between the schools

The principal transfer of packed crates and retained furniture to Fitzjohn’s Avenue was scheduled over three days in August. Ede’s allocated move teams, vehicles and handling equipment to the individual phases, with parking dispensation included in the relocation scope.

Storage and onward delivery

Storage handling was an integral part of the brief. A separate instruction covered sorting approximately 200 crates and loose items at Ede’s facility into two groups, one for Netherhall Gardens and the other for Fitzjohn’s Avenue. The plan included a school representative working alongside Ede’s crew to identify the contents for each destination.

A late-August phase provided for crates and other stored items to be loaded and delivered to either school. A further job instruction covered delivery from storage to Fitzjohn’s Avenue on 2 September, including distribution to the ground floor, lower ground floor and library.

A coordinated relocation programme

Ede’s coordinated approach brought school removals, internal furniture moves, crate logistics and storage handling into a single schedule. Planning these activities as connected phases linked preparation and storage handling with the moves between schools and onward deliveries.

For North Bridge House, this meant planning the relocation services around the requirements of both sites, with crews, vehicles and handling equipment allocated to each stage.

Review notes before publication

The supplied documents establish the scope and planned programme. They do not include signed completion records or client feedback. The following points remain to be confirmed for the final case study.

•  Actual completion dates, final crate quantities and whether all scheduled phases took place.

•  The final outcome, including any disruption, damage or issues resolved during the programme.

•  What happened to redundant furniture, including any confirmed reuse, donation or recycling.

•  Any client comment and permission to publish the school name and project photographs.

Source records  Ede’s quotations 11185/9, 11185/11 and 11185/12; job sheets 11185/2458 and 11185/2557. Review notes are internal and should be removed from website copy.

‍

Get Started

Request Your Free relocation Quote Today!

Just like our valued clients, if you are looking for help with any of our services please do get in touch today for a free quote.

Get Free Quote
Get Free Quote

Related Case Studies

Don't just take our word for it

Review the kind words from some of our clients and start your move with Ede's today!

Get Started

Request Your Free relocation Quote Today!

Get Free Quote
Get Free Quote
Free  Quote | 020 8773 6700